Skip to main content
AltesoraTile · Stone · Bathrooms
A white vinyl double-hung replacement window unit with two sashes and a central meeting rail, leaning against a plaster wall
A white vinyl double-hung replacement window unit with two sashes and a central meeting rail, leaning against a plaster wall

Sample listing. Specification and pricing shown here are illustrative while the real catalogue is loaded. Ask us for a current quote on the actual material.

Windows & doors

Double-hung replacement window

Insulated double-hung unit, made to the measured opening

Priced after survey

Made to order

Lead time Quoted after survey

Size and colour

Quoted rather than listed

This is made or measured to order, so a listed price would be misleading. Send us the opening sizes or the area and we will quote it properly.

Request a quote

How much you need depends on the room, and what it costs to fit depends on what is behind the wall. Build the list here and send it for a quote — we check the amounts against the room and price the materials and the work together.

About this material

A double-hung replacement unit made to each measured opening. Openings vary, particularly in older masonry, so every window is scheduled individually rather than ordered as a set.

Supplied with installation. We measure, order against the schedule, and finish both the interior return and the exterior trim.

Where it belongs

  • Window replacement

Specifications

Type
Double-hung
Glazing
Insulated, clear or obscure
Sizing
Made to the measured opening
Pricing
Quoted after an on-site survey

Suitability

  • Walls — not suitable
  • Floors — not suitable
  • Wet areas — not suitable
  • Underfloor heating — not suitable
  • Outdoor — suitable

Delivery and pickup

Shipping
Delivered by arrangement. Installation included. Shipping policy
Pickup
Not available for this item — it ships or travels with our installation team.
Returns
Unopened boxes from stocked lines are returnable; made-to-order material is not. Returns policy

Goes with it

The parts of the assembly this material depends on. Ordering them together avoids the mid-project discovery that the mortar is wrong for the format.